YOUR AD HERE »

Paving operations to cause delays near Old Snowmass light

Share this story
A cyclist on Lower River Road on Wednesday, April 16, 2025, near Old Snowmass and Woody Creek.
Austin Colbert/The Aspen Times

Paving operations are set to begin Sept. 24 at Lower River Road near the Old Snowmass light to Gerbaz Ways, continuing through Sept. 30.

The operations will cause 30-minute delays from 7 a.m. to 7 p.m., with a pause during the weekend. Drivers are asked to use Colorado Highway 82 as an alternate route.

Paving will continue after Sept. 30 with shorter 15-minute delays anticipated.

Share this story
Local


See more