Bridge plans necessary | AspenTimes.com
YOUR AD HERE »

Bridge plans necessary

Aspen Times writer

Dear Editor:(This letter was originally addressed to Bert Myrin.)There are no plans for a six-lane bridge. The bridge will have two vehicle lanes and two bus lanes. Additional footage is for safety. I guess one can characterize the bridge width as a six-lane bridge, but that would be incorrect.I know that you and others have a concern that moving the two lanes for auto and two lanes for bus closer to town will put pressure on building across the Marolt. I don’t share this concern. The bridge needs to be replaced, and it is required to have a transit component. A two-lane bridge would not meet that standard. For all practical purposes, a two-vehicle/two-bus lane highway configuration exists on the downvalley side of the bridge, and one could construe the roundabout as having four lanes. I have not changed my position on the Marolt, but I believe moving forward with the new Maroon Creek bridge is necessary.Helen KlanderudAspen mayor


Support Local Journalism

Support Local Journalism

Readers around Aspen and Snowmass Village make the Aspen Times’ work possible. Your financial contribution supports our efforts to deliver quality, locally relevant journalism.

Now more than ever, your support is critical to help us keep our community informed about the evolving coronavirus pandemic and the impact it is having locally. Every contribution, however large or small, will make a difference.

Each donation will be used exclusively for the development and creation of increased news coverage.

For tax deductible donations, click here.
 

Start a dialogue, stay on topic and be civil.
If you don't follow the rules, your comment may be deleted.

User Legend: iconModerator iconTrusted User